What Should Be in an Activewear Tech Pack? A Factory-Ready Checklist
- Share
- Issue Time
- Aug 5,2026
Summary
A practical factory-side guide to building an activewear tech pack before sampling. It explains technical flats, finished garment measurements, fabric specifications, BOM, construction notes, logo files, labels, packaging, testing, revision control, and the common gaps that lead to unclear quotations or repeated sample corrections.

An activewear tech pack does not need to be perfect before you contact a manufacturer. It does, however, need to show what has already been decided, what is still open for development, and what the factory should not be expected to guess.
That distinction matters. When product instructions are spread across sketches, screenshots, emails, and chat messages, the merchandiser, pattern maker, sample room, logo supplier, and production team may all work from slightly different information.
A clear tech pack gives those teams one controlled reference. It helps the factory understand the product, prepare a more comparable quotation, make the first sample, record changes, and transfer the approved design into bulk production.
A factory-ready activewear tech pack should show what the garment looks like, how it should fit, what it is made from, how it is constructed, and where every logo, label, and trim belongs.
It should normally include technical flats, a sample-size measurement specification, fabric information, a bill of materials, construction callouts, artwork details, labeling, packaging requirements, testing expectations, and a visible revision number.
Not every item must be finalized before the first conversation with a factory. Unresolved items should simply be marked as open for development instead of being left blank for someone to guess.
1. What Does “Factory-Ready” Actually Mean?
“Factory-ready” does not always mean that every production detail has already been approved. It means the document contains enough information for the next stage of work.
A tech pack normally moves through three levels of readiness.
| Stage | Purpose | Minimum information normally required |
|---|---|---|
| Quote-ready | Allows the factory to understand the product and prepare an initial cost estimate. | Front and back views, product description, target fabric, key construction details, logo requirements, quantity, color count, size range, and packaging level. |
| Sample-ready | Allows the pattern and sample teams to make the first physical prototype. | Technical flats, sample-size measurements, fabric direction, BOM, construction notes, logo placement, reference sample information, and open development points. |
| Production-ready | Allows the approved sample to be reproduced consistently across the order. | Final graded measurements, approved materials, color standards, artwork files, labels, packaging, testing requirements, tolerances, approved PPS, and locked revision number. |
This separation prevents a common mistake: asking a startup brand to complete every production document before the factory has even reviewed the design.
A brand may not know the final fabric code or seam type when it first approaches a manufacturer. That is acceptable when the tech pack clearly states:
That instruction gives the factory a defined performance target without pretending that a specific material has already been approved.
2. Start With Clear Style Identification
The first page should identify the style before anyone begins discussing the details.
At minimum, the cover page should normally include:
- Brand or project name
- Style name
- Style number
- Product category
- Season or collection
- Sample size
- Intended size range
- Designer or project contact
- Creation date
- Current revision number
- Revision date
- Development or approval status
The same style number and revision should appear across the cover page, measurement specification, BOM, artwork files, sample comments, and approval records.
3. Technical Flats Should Explain the Product
Lifestyle photographs and inspiration images are useful for showing mood, fit, and styling. They are not a substitute for technical flats.
A factory normally needs clear front and back views. Depending on the product, it may also need:
- Side view
- Inside view
- Lining construction
- Waistband interior
- Gusset shape
- Pocket construction
- Bra cup and underband construction
- Adjustable strap details
- Zipper guard or pocket-bag construction
- Bonded or laser-cut sections
- Local enlargements of complex details
Each design callout should point to a visible part of the drawing and explain what the factory is expected to make.
The second instruction tells the pattern maker where the pocket belongs, how large the opening should be, what it should hold, and where reinforcement is required.
4. Measurement Specifications: Body Size Is Not Garment Size
One of the most important parts of an activewear tech pack is the finished garment measurement specification.
A consumer-facing size chart normally describes the body the garment is intended to fit. A production measurement sheet describes the garment itself.
Stretch activewear often uses negative ease. The finished garment may be smaller than the body because the fabric is expected to stretch during wear. That relationship depends on the fabric's extension, recovery, garment construction, and intended compression level.
What a Measurement Sheet Should Include
- POM number
- Measurement name
- Diagram showing the measurement location
- Sample-size value
- Measurement unit
- Tolerance
- Grade rule or measurements for other sizes
- Special measuring condition
Special measuring conditions matter for stretch garments. The document should explain whether a measurement is taken:
- Relaxed or extended
- Flat or around the full circumference
- Before or after washing
- With removable pads inserted or removed
- Along the seam or in a straight line
Illustrative Legging Measurement Table
| POM | Measurement | Sample size | Example value | Example tolerance |
|---|---|---|---|---|
| 01 | Waist width, relaxed, measured straight across top edge | M | 33.0 cm | ± 1.0 cm |
| 02 | Hip width, 18 cm below top waistband edge | M | 38.0 cm | ± 1.0 cm |
| 03 | Front rise, including waistband | M | 25.5 cm | ± 0.8 cm |
| 04 | Back rise, including waistband | M | 34.0 cm | ± 0.8 cm |
| 05 | Inseam length | M | 64.0 cm | ± 1.0 cm |
| 06 | Leg opening width, measured straight | M | 10.5 cm | ± 0.7 cm |
The values above are illustrative examples only. They are not a universal size standard and should not be copied into a production tech pack without fit development.
Do You Need Full Grading Before the First Sample?
Not always. A first development sample can often be made from one approved sample-size specification.
Full grading becomes necessary before size-set approval and bulk production. The brand and factory should agree who is responsible for creating the grade rules and who approves them.
Leaving that responsibility unclear can result in an approved medium sample but inconsistent proportions in extra-small or extra-large sizes.
5. Fabric Information Must Go Beyond Composition
“75% nylon and 25% spandex” is a useful starting point, but it does not completely describe a fabric.
Two fabrics with the same fiber composition can have different:
- Weight
- Knitting structure
- Stretch percentage
- Recovery
- Surface appearance
- Hand feel
- Compression
- Opacity
- Pilling performance
- Colorfastness
Recommended Fabric Information
- Fiber composition
- Fabric construction or knit type
- GSM or fabric weight
- Usable width
- Two-way or four-way stretch
- Lengthwise and crosswise stretch expectations
- Recovery requirement
- Surface finish
- Target hand feel
- Color or Pantone reference
- Approved mill or supplier, when nominated
- Recycled or certification requirement
- Required performance testing
The second description is still open for material development, but it gives the sourcing team measurable boundaries.
6. Build a Complete Bill of Materials
The bill of materials, usually called the BOM, lists every material and component required to make and pack the product.
A sports bra BOM may include more than the outer fabric. It can also include lining, power mesh, elastic, cups, sliders, rings, thread, labels, logo transfers, hangtags, polybags, and barcode stickers.
Illustrative Activewear BOM
| Item | Component | Specification | Color | Placement or use |
|---|---|---|---|---|
| 01 | Main fabric | 75% nylon / 25% spandex interlock, 300 GSM | Pantone reference or approved swatch | Main garment body |
| 02 | Lining | Lightweight stretch lining | Tonal | Front bra panel |
| 03 | Underband elastic | 35 mm brushed elastic | Black | Inside bottom band |
| 04 | Bra pads | Removable molded pads, approved shape | Nude | Insert through internal pocket |
| 05 | Main logo | Silicone heat transfer, 45 mm wide | White | Center back waistband |
| 06 | Care label | Heat-transfer label | Light gray | Inside back body |
| 07 | Packaging | Individual recyclable polybag with size sticker | Clear | One garment per bag |
This BOM is an illustrative layout, not a finished specification for a real product.
Use a Colorway Table
When a style has several colors, do not assume every component changes automatically with the main fabric.
| Component | Black colorway | Blue colorway | Pink colorway |
|---|---|---|---|
| Main fabric | Black | Approved blue | Approved pink |
| Thread | Tonal black | Tonal blue | Tonal pink |
| Logo | White | White | Dark brown |
| Elastic | Black | Tonal blue | Tonal pink |
| Care label | Light gray | Light gray | Dark gray |
This prevents the factory from deciding component colors independently after the main fabric has already been approved.
7. Construction Notes Must Be Specific Enough to Execute
Construction notes explain how the garment should be assembled.
Depending on the product, they may cover:
- Seam type
- Stitch type
- Seam allowance
- Thread type
- Flatlock placement
- Overlock construction
- Coverstitch width
- Bartack locations
- Bonding width
- Reinforcement points
- Raw-edge or clean-finish requirements
- Gusset construction
- Lining attachment
- No-front-seam construction
The tech pack does not need to specify a technical value simply to sound professional. A stitch density, seam allowance, or bonding temperature should only be fixed when it is part of an approved construction standard.
The instruction should describe the intended construction and quality outcome. The final machine settings can then be confirmed during sample development and pre-production approval.
8. Logo, Artwork, Labels, and Packaging
“Logo on left leg” is not enough information for a logo supplier.
Artwork instructions should normally include:
- Vector artwork file
- Final finished dimensions
- Placement measurements
- Color reference
- Application technique
- Surface finish
- Orientation
- Approved reference sample, when available
Label Information
The tech pack should identify:
- Main label or heat-transfer branding
- Size label
- Care and content label
- Country-of-origin information
- Placement
- Finished dimensions
- Label material
- Required language
Packaging Information
Packaging details may not be needed for an early development sample, but they should be finalized before bulk packing.
- Folding method
- Individual polybag type
- Warning text
- Size sticker
- Barcode sticker
- Hangtag and attachment position
- Tissue paper or inserts
- Carton quantity
- Carton dimensions
- Carton markings
- Assortment requirements
9. State the Performance Requirement Before Naming a Test
Activewear performance requirements may include:
- Stretch and recovery
- Opacity during movement
- Colorfastness
- Pilling resistance
- Dimensional stability
- Seam strength
- Logo durability
- Perspiration resistance
- Wash appearance
- Moisture-management performance
The tech pack should first state the required product outcome. The brand, factory, buyer manual, or accredited laboratory can then confirm the appropriate test method.
Avoid adding a test number simply because it appears technical. A standard is only useful when the correct method, specimen preparation, performance level, and testing responsibility have been agreed.
10. Revision Control Is Part of the Tech Pack
A tech pack is not finished after the first sample is issued. It should be updated after every confirmed change.
Good revision control means:
- Every issue has a visible version number.
- Old versions are archived rather than silently overwritten.
- Each change is recorded in a revision log.
- Sample comments include photographs and location references.
- Required changes are separated from discussion points.
- Approved and unresolved items are clearly marked.
- The production version is locked after PPS approval.
Illustrative Revision Log
| Revision | Date | Change | Status |
|---|---|---|---|
| V1 | May 3 | Initial development pack issued | Sample requested |
| V2 | May 12 | Waistband height reduced by 2 cm; pocket opening enlarged | Revised sample |
| V3 | May 20 | Logo size, pocket shape, and inseam approved | PPS requested |
| V4 | May 28 | Final color, labels, packaging, and graded measurements approved | Production approved |
11. Common Tech Pack Gaps and Their Factory Impact
A missing detail does not always stop a sample from being made. It does mean someone must make an assumption.
| Missing or unclear information | Likely factory impact |
|---|---|
| No technical flats | The pattern maker interprets the product from photographs, which may hide seams, lining, pockets, or back construction. |
| Only body measurements | The factory must estimate finished garment measurements and negative ease. |
| No fabric weight | Different suppliers may quote materials with the same composition but very different weight, hand feel, and cost. |
| No logo dimensions | Logo price and placement remain estimated, and the first sample may use the wrong scale. |
| No BOM | Lining, elastic, padding, labels, packaging, or special trims may be missing from the quotation. |
| No Pantone or approved color standard | Screen colors or reference photos may be interpreted differently by the fabric mill and garment team. |
| Construction conflicts with the drawing | The sample room must decide which instruction has priority. |
| Changes remain in chat messages | The sample team and bulk-production team may work from different instructions. |
| No packaging specification | Packaging cost is estimated or excluded, and final packing may delay shipment. |
| No revision number | Different departments may use different file versions without realizing it. |
12. A 10-Point Factory-Readiness Check
The following scoring tool is a practical screening method for this guide. It is not an industry standard and does not guarantee that a sample will be approved on the first attempt.
Add one point for each item already included:
- Clear style identification and revision number
- Front and back technical flats
- Sample-size finished garment measurements
- Target fabric specification
- Bill of materials
- Construction and seam callouts
- Logo artwork, size, and placement
- Label and packaging direction
- Performance and testing expectations
- Revision log or sample-comment process
8–10 points: The pack is likely ready for detailed factory review and sample planning.
5–7 points: The product is understandable, but the factory will probably need clarification before quoting or sampling.
0–4 points: Begin with a product-development discussion before expecting a firm quotation or accurate sample.
13. Pre-Sample Handoff Checklist
Required Before the First Sample
- Style number and current revision
- Front and back technical flats
- Sample size
- Finished garment measurements for the sample size
- Target fabric or performance description
- Main construction instructions
- Logo type, approximate size, and intended placement
- Reference sample or reference image notes
- List of open development questions
Can Remain Open for Factory Development
- Final fabric code, when the factory is sourcing alternatives
- Exact thread or needle selection
- Final stitch settings
- Some internal finishing details
- Final packaging quantity
- Final grading, when only the first sample size is being developed
Must Be Approved Before Bulk Production
- Pre-production sample
- Final graded measurement specification
- Bulk fabric and color
- All trims and accessories
- Logo artwork and production technique
- Labels and legal content
- Packaging and barcodes
- Testing requirements
- Production revision number
- Inspection and shipment requirements
14. What Should You Send If You Do Not Have a Complete Tech Pack?
A brand does not need to wait until every technical page is finished before contacting a manufacturer.
At an early stage, send as much of the following as you have:
- Sketches or product photographs
- Front, back, and detail references
- Target product category
- Desired fit and support level
- Preferred fabric composition or hand feel
- Target order quantity per style and color
- Expected size range
- Logo and packaging expectations
- Target market
- Required sample or launch date
The most useful early-stage instruction is not “make it exactly like this photo.” It is an explanation of which features must be retained and which features can be developed by the factory.
This gives the development team enough direction to provide useful recommendations without copying every element blindly.
Frequently Asked Questions
Can a factory make an activewear sample without a tech pack?
Yes, some factories can develop a sample from sketches, photographs, or a physical reference garment. However, the factory will need to make more assumptions about fit, measurements, fabric, construction, and details. The project should still be converted into a controlled technical document before bulk production.
How many pages should an activewear tech pack have?
There is no correct universal page count. A simple training T-shirt may need only a few pages, while a high-support sports bra with lining, molded cups, adjustable hardware, several trims, and custom packaging may require considerably more. The document should be complete enough to remove important ambiguity without repeating the same information unnecessarily.
Do I need a fully graded size chart before making the first sample?
Not always. The first sample can often be developed from one sample-size specification. Full grading should be completed and approved before size-set confirmation and bulk production.
What is the difference between a BOM and a tech pack?
The BOM is one part of the tech pack. It lists the fabrics, trims, labels, artwork applications, and packaging components used in the product. The complete tech pack also includes drawings, measurements, construction, colorways, artwork placement, testing, packaging, and revision control.
Can an activewear manufacturer help complete a tech pack?
Many full-service OEM and ODM manufacturers can help develop measurements, materials, construction, grading, and sample comments. The buyer and factory should agree which parts are supplied by the brand, which parts are proposed by the factory, and who owns and approves the final technical documents.
How detailed should the fabric specification be?
Include as much confirmed information as possible: composition, structure, weight, width, stretch, recovery, surface finish, hand feel, color, certification, and performance requirements. When the material has not been selected, provide a clear target and ask the factory to propose suitable options.
What file formats should be included?
The main tech pack is commonly shared as a PDF, while measurement tables and BOM data may also be supplied in spreadsheet format. Logos and print artwork should be provided as editable vector files when possible. File names should include the style number and revision so that each document can be traced.
Final Takeaway
A factory-ready activewear tech pack is not simply a collection of attractive drawings. It is a controlled set of instructions connecting the design, fit, material, construction, artwork, packaging, testing, and approval history.
The document does not have to answer every question before the first factory conversation. It does need to distinguish between confirmed requirements, factory proposals, and unresolved decisions.
When that distinction is clear, quotations are easier to compare, sample comments are easier to track, and the approved product is easier to transfer into production without relying on memory or scattered chat messages.
Is Your Activewear Tech Pack Ready for Sampling?
Send us your current tech pack, sketches, reference images, target quantity, fabric preference, and required launch date. Our product development team can review the available information and identify the key points that should be confirmed before sampling.
Request a Tech Pack Review